The part you keep in-house
A supplier can save a team months of work. It can also take a critical learning opportunity with it.
- Desk
- Briefing
- Discussion
- The open question
Find the moving requirement
Picture a company developing a field sensor. The enclosure may be easy to specify while the sensing method is still unsettled. A supplier can quote a fixed enclosure drawing. It has a harder time quoting a component whose purpose changes each time the engineering team visits a customer.
Name what you need to learn
Write down what the team expects to discover by making the part. It might be how moisture reaches a connector or how often a customer needs a replacement. If the answer would never change the product, manufacturing the part internally may buy less learning than the team imagines.
Plan for a supplier change
Ask another engineer to identify the drawings, inspection checks and acceptance conditions a replacement supplier would need. Missing information exposes decisions the team has effectively delegated. Sometimes that is a sensible trade. Recording the trade keeps a purchasing choice from becoming an invisible design constraint.
Which piece of knowledge would your team lose if the supplier changed tomorrow?